Oakville · Exterior package

Deck & fence package

IllustrativeModel A · Shared Plan contracts

Exterior work across parties on one tight site — deck repair, fence and site cleanup, sequenced by disclosed access windows.

IllustrativeRefreshed cedar deck and fence with material samples and a measuring tape in the foreground.

01 The goal

Coordinate a deck repair, a fence and a site cleanup across parties sharing one narrow site, ending in a clean hand-off.

  • A single narrow site two providers had to share
  • Fence work blocked the only access the deck package needed
  • Weather-dependent finishing that could not be promised to a date

02 Named participants

Every business expected on site is named before work begins — disclosure, not pre-verification by the Collective.

Shared Plan
Coordinator & contracting party
Owns the plan and the access schedule; the homeowner contracts with Shared Plan under Model A.
Provider per job
Deck repair
A deck provider named and disclosed for this job — not pre-verified by the Collective.
Provider per job
Fence
A fencing provider named and disclosed for this job.
Homeowner
Decisions & access
Approves the plan and the access sequencing.

03 Work packages

Each package has exactly one accountable owner — never “the team.”

Work packagesIllustrative
01
Deck repair
Failing boards and railing replaced and the structure made sound within supported scope.
Provider per job
02
Fence
Fence repair sequenced so it did not block the deck package’s access.
Provider per job
03
Site cleanup
Debris removal and a clean hand-off as the final package.
Shared Plan

04 Sequencing challenge

Both providers needed the same narrow side access, and the fence work sat directly across the route the deck package used — so the two could not simply run in parallel.

05 Key decision

Sequenced access windows were disclosed up front: each provider had a named window on the shared site, agreed before either started, so the tight site never became a collision.

06 A recorded change

Change order · agreed before work continued

One deck post footing was found more degraded than expected. Replacing it was written up as a versioned change with its own price and accepted before the deck package continued.

The budget carried the deck and fence packages as named totals with a small contingency the homeowner had explicitly approved — the footing change was drawn from it transparently, not silently.

07 Milestones

  1. Brief accepted
    Goal and shared-site constraint recorded.
  2. Site assessment
    Packages, dependencies and access windows set.
  3. Scope & budget approved
    Plan approved with a named contingency.
  4. Access windows run
    Each provider worked its disclosed window.
  5. Change approved
    Footing change priced and accepted.
  6. Cleanup & sign-off
    Site cleaned; homeowner signed off.

08 Result & sign-off

A clean handoff and a signed-off closeout, with a shared site sequenced by disclosed windows rather than left to chance.

Completion. All packages completed; the closeout recorded the access sequence, the approved footing change and the final budget.

Deficiencies. One deficiency (a gate alignment) was recorded, completed by the responsible provider and accepted before sign-off.